Keep projects on track with Independent Design Reviews
The datum point on the piping plan was off, and so too were all the piping spools. Work on-site came to a halt as the superintendent scrambled to submit RFIs, and welders stood around awaiting clarifications. Meanwhile, the project costs skyrocketed. The building corner was over 12" from the datum point location in reality. The Engineer-of-Record (EoR) chose the corner of the process room as the datum point; however, the building plans were not as-built, and the corner of the
Nov 11


See us at RNG Works 2025!
Visit us at RNG Works 2025 in Nashville, TN, at Booth 1017.
Sep 16


Protecting Flange Faces Limits Rework
Would you like to know of an easy way to limit rework and keep your piping projects on schedule? This pressure vessel nozzle flange was...
Sep 7


Reduce Turnaround Delays with Source Inspection
Have you ever received a piping spool with the wrong flange or an incorrect dimension? These flanges were cut off spools because they...