top of page
Turnaround Talks
Plant Design & Asset Integrity Management Technical Resources


Are Your Piping Isometric Drawings Issued for Construction Without Field Welds?
Do your piping isometric drawings get issued for construction with field welds located, or do you leave that up to the contractor performing the installation? I started noticing a pattern about ten years ago: engineering firms were issuing piping isometric drawings for construction without identifying field welds. One firm was reprimanded for placing field welds on a project, and management decided to stop locating field welds altogether. At Turnaround EPC, we believe constru
May 11


2026 ISA Texas Channel Automation Expo
Meet the Turnaround EPC Team at the ISA Texas Channel Automation Expo! Meet the Turnaround EPC team at the Pasadena Convention Center on April 9th, for the 2026 ISA Texas Channel Automation Expo. Enjoy free BBQ and beverages while catching up on the latest instrumentation, automation, and controls technology for your process plant. Register to attend by scanning the QR code above. Renewable Natural Gas Metering and Regulating Custody Transfer Unit Turnaround EPC provides turn
Mar 19


Stop Losing Margin at the Loading Rack
Fuel terminals are under more pressure than ever to control costs, maintain product quality, and keep trucks moving. Yet one of the biggest sources of silent margin loss still happens at the loading rack, specifically in terminals that rely on splash blending for ethanol or additives. Side‑stream blending has emerged as the preferred upgrade for terminals that want tighter control, lower operating costs, and a more consistent customer experience. The shift is happening nation
Feb 26
bottom of page
